Terminal Overfill with FINCH III (wiring diagrams)

Terminal Overfill with FINCH III (wiring diagrams)

FINCH III + Optic Booster = Terminal Overfill Solution

You can connect an API socket directly to a FINCH III display to enable terminal overfill protection at the loading rack. This integration eliminates the need for a separate overfill protection system, as the FINCH III display provides the required permit signals, along with real-time liquid level measurement for each compartment and terminal overfill.

To implement this solution, wire an Optic Booster to your existing FINCH III circuit board. The information below will guide you through a successful installation.

Booster-FINCHIII
Wiring Schematic

FINCH III + Optic Booster to Dual API Socket

The image below shows a visual of wiring an Optic Booster to a FINCH III system, connected to a standard API Socket for rack loading. Click the diagram to expand and download the full file.

FINCH III with Optic Booster to Dual Socket-1
Installation Diagram

1 Compartment System with Rack Loading

The image below shows a visual of a 1 compartment system, that includes an external horn and solenoid operated valve installed on the tank, connected to a standard API Socket for rack loading. Click the diagram to expand and download the full file.

FINCH III 1 Compartment System with Rack Control-Installation Diagram-1
Installation Diagram

2–6 Compartment System with Rack Loading

The image below shows a visual of a 2+ compartment system, that includes an external horn and solenoid operated valve installed on the tank, connected to a standard API Socket for rack loading. Click the diagram to expand and download the full file.

FINCH III_ 2-6 Compartment System with Rack Control-Installation Diagram